开关箱选择JSP-K/2-B,箱内开关为DZ47-63/2 ,其额定电流值为63A。 漏电保护器为DZ15LE-63/2901 。

分配电箱进线计算

A、计算电流 Kx=0.7,cosφ=0.7 Ijs =

Kx ×∑Pe

23

1.732×0.4×0.7 ×Ue×cosφ

该分箱下最大组线电流Ijs =43.3A 两者取大值:Ijs =43.3A B、选择导线

=

0.7×30.0

= 43.3A

选择BX-3×10+2×6,穿硬塑料管敷设安全载流量为52.0A。 C、选择分配电箱型号与箱内电气设备

分配电箱选择JSP-F/7-B,箱内开关为DZ47-63/2 ,其额定电流值 = 63.0A。

干线计算(2#总箱)

A、计算电流 按导线安全载流量: Kx=0.7,cosφ=0.9 Ijs =

Kx ×∑Pe

23

1.732×0.4×0.9 ×Ue×cosφ

该干线下最大分配箱电流Ijs =175.52A

=

0.7×247.8

= 278.19A

两者取大值:由于干线下有多个分配电箱,所以最大电流需要乘以1.1的系数.Ijs =278.19×1.1=306.01AA 按允许电压降:

0.7×(32.0×30.0+32.0×30.0+

Kx ×∑(P×L) 121.6×30.0+32.2×30.0+

S= = = 13.52mm2

30.0×30.0)

CΔU 77.0×5.0

C-----计算系数,在三相四线制供电线路上,铜线的计算系数为77,铝线为46.3

青岛金沙滩建设集团有限公司 临时用电专项方案

ΔU----允许电压降 B、选择导线

选择BX-3×185+2×120,穿硬塑料管敷设安全载流量为330.0A。 C、选择干线开关

干线开关为DZ20Y-400/3300,其额定电流值= 400.0A。 漏电保护器为DZ20L-400/4300 。

总配电室计算

A、计算电流

总计算电流=282.17A。

总配电室下最大的干线电流=316.02A。

两者取大值:由于总配电室下有多个干线,所以最大电流需要乘以1.1的系数.Ijs =316.02×1.1=347.62A。

由于距离短,可不校核电压降的选择。 B、选择导线

选择BLX-3×240+2×150,穿硬塑料管敷设安全载流量为0.0A。 C、选择电气设备

总配电室采用JSP-Z/5-B,总进线开关采用DZ20Y-400/3300,其额定电流值=400.0。漏电保护器采用DZ20L-400/4300。

青岛金沙滩建设集团有限公司 临时用电专项方案

八、绘制临时供电施工图

1、临时供电系统图

总配电室 额定电流=

347.62A

DZ20Y-400/3300 BLX-3×240+2×150 DZ20L-400/4300 DZ20Y-400/3300 DZ20L-400/4300 BX-3×185+2×120 干线1#总箱 DZ20Y-400/3300 DZ20L-400/4300 BX-3×185+2×120 干线2#总箱 青岛金沙滩建设集团有限公司 临时用电专项方案

BX-3×185+2×120干线1#总箱DZ20T-40/3BX-3×10+2×6DZ20T-40/3DZ15LE-40/2901BX-3×10+2×6塔式起重机21.7KWDZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+2×1.5照明箱7KWBX-3×10+2×6DZ47-63/2DZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+1×1.5插入式振动器1.1KWDZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+1×1.5插入式振动器1.1KWDZ47-32/2BX-3×6+2×4分箱1(4#楼塔吊)DZ20T-40/3BX-3×10+2×6DZ47-32/2DZ47LE-32/2BX-3×2.5+1×1.5插入式振动器1.1KWDZ20T-40/3DZ15LE-40/2901BX-3×10+2×6塔式起重机21.7KWDZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+2×1.5照明箱7KWBX-3×10+2×6DZ47-63/2DZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+1×1.5插入式振动器1.1KWDZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+1×1.5插入式振动器1.1KWDZ47-32/2BX-3×6+2×4分箱2(3#楼塔吊)DZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+1×1.5插入式振动器1.1KWDZ47-32/2DZ47LE-32/2BX-3×2.5+2×1.5钢筋调直机5.5KWDZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+2×1.5钢筋切断机5.5KWDZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+2×1.5钢筋切断机3KWDZ47-32/2BX-3×6+2×4DZ20-250T/3330BX-3×120+2×70DZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+2×1.5钢筋弯曲机3.8KWDZ47-32/2DZ47LE-32/2BX-3×2.5+2×1.5钢筋弯曲机3.8KWDZ20-250T/3330BX-3×70+2×35DZ20-250T/3330DZL25-250/3901BX-3×70+2×35对焊机100KWDZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+2×1.5木工圆锯5.5KWDZ20T-40/3BX-3×6+2×4分箱3(加工区)DZ47-63/2BX-3×16+2×10DZ20T-40/3DZ15LE-40/2901BX-3×6+2×4交流电焊机23.4KWDZ47-63/2DZ15LE-63/2901BX-3×16+1×10混凝土输送泵32.2KWBX-3×16+2×10DZ47-63/2DZ47-32/2BX-3×6+2×4DZ47-32/2DZ47LE-32/2BX-3×2.5+2×1.5照明箱7KWDZ47-32/2BX-3×6+2×4分箱4(地泵)DZ47-32/2DZ47LE-32/2BX-3×2.5+1×1.5潜水泵2.2KW

联系合同范文客服:xxxxx#qq.com(#替换为@)