Attachment-2 Inspection and Test Plan for Road Works

Page 45 of 55 Revision 0

Attachment-3 Inspection and Test Plan of Materials

Page 46 of 55 Revision 0

Attachment-4 Backfilling report Form No: CV-02

BACKFILLING REPORT Form No. CV-02 Area: ……………………………………………………………………………………………………….. Description : ……………………………………………………………………………………………….. Soil Condition/ Type : ……………………………………………………………………………………… Type of Backfilling Material : ……………………………………………………………………………... Drawing No. : ……………………………………………………………………………………………… Max. Site Soil Dry Density (gm/cm3) = ………………………………………………………………….. Elevation Layer No. Remarks Notes: Comments: Contractor Construction Department NAME DATE SIGNATURE QA/QC Client/Consultant

Page 47 of 55

Revision 0

Attachment-5 Compaction Report Form No: CV-03 COMPACTION REPORT Form No. CV-03 DATE: ……………………………………… AREA: ……………………………………………………… DESCRIPTION: ………………………….................................... MATERIAL ORIGIN: ………………………………… MATERIAL MAX. DENSITY: ………………………… OPTM. MOSITURE CONTENT :………………………. Max site soil dry density = g/m3 LAYER COMMENTS: APPROXIMATE LAYER TICKNESS ELVATION TEST RESULT MOIST.% QA/QC Engineer PROCTOR% SPECIFICATION RESULT Construction Department NAME DATE SIGNATURE Client/Consultant

Page 48 of 55 Revision 0