Execution Plan Ö´Ðмƻ® 6.2 In concrete casting, check form¡¯s deformation at any time and make adjustment. ½½Öþ»ìÄýÍÁʱ£¬Ëæʱ¹Û²ìÄ£°åÓÐÎÞ±äÐΣ¬¼°Ê±µ÷ÕûÄ£°å¡£

6.3 Before form closing, clean foreign matters. ºÏÄ£°åÇ°£¬ÔÓÎïÒªÇåɨ¸É¾»¡£

6.4 Upon rebar binding completion, and conceal work checked and accepted, form closing can

be carried out. Before form closing, weld positioning rebar. Blanking for positioning rebar will be exact, with both ends rubbed down.

°óÔú¸Ö½îÍê±Ïºó£¬¾­Òþ±ÎÑéÊպϸñºó£¬·½¿É½øÐкÏÄ£¡£Ä£°åºÏģǰÐ躸½Ó¶¨Î»¸Ö½î¡£¶¨Î»¸Ö½îÏÂÁÏ׼ȷ£¬Á½¶Ëĥƽ£»

Page 45 of 162 Rev.01

Execution Plan Ö´Ðмƻ®

Chapter 5 Rebar Installation Scheme

µÚÎåÕ ¸Ö½î°²×°·½°¸

Requirments 񻂗

a.Mill test reports certifying physical and chemical properties or ex-factory certificate of

qualification for reinforcing steel to be delivered to the site.

¸Ö½îÔ˵ֹ¤µØ֮ǰ£¬Ìṩ¸Ö½îµÄ¹ØÓÚÎïÀí»¯Ñ§ÐÔÄܵÄÔþÖÆÊÔÑ鱨¸æÊé»ò³ö³§ºÏ¸ñÖ¤¡£

b. Manufacturers product data sheets shall be submitted for: welded wire fabric, welding

electrodes, and mechanical couplers.

Ìṩ³§É̺¸½Ó¸ÖË¿Íø¡¢º¸Ìõ¼°»úеÁ¬½ÓÒ»ÀÀ±í¡£

c. Shop and placement drawings showing all piece numbers, quantities,grades, sizes, bar

bend requirements, positions, spacing, clearances,splices, welds, splice devices, supports, etc

Ê©¹¤ÏêͼӦ±êÃ÷£º¸Ö½î±àºÅ¡¢ÊýÁ¿¡¢µÈ¼¶¡¢¹æ¸ñ¡¢ÍäÆð¡¢Î»ÖᢼÜÁ¢½î¡¢¾»³¤¶È¡¢½ÓÍ·¡¢º¸½Ó¡¢½ÓÍ·Æ÷¼þ¡¢¸Ö½îµæ¿éµÈ¡£

d. A copy of all welders¡¯ certifications prior to any welding.

¸÷ÖÖº¸½Óº¸¹¤µÄ×ʸñÖ¤Êé¡£

e. Inspection report, aiming at laying and welding of reinforcing steel.

ÓйظֽîÆÌÉèºÍº¸½ÓµÄ¼ì²é±¨¸æ¡£

1. Material Requirement²ÄÁÏÒªÇó

1.1 Each patch of the rebar must be identified with tag, ex-shop quality certificate and test

report. The rebar delivered to the site shall be inspected as per the patch number and the diameter for acceptance. The acceptance includes tag and visual appearance inspection as well as random sampling for dynamic test in compliance with related codes. Only when the random sampling for dynamic test is qualified can the material be used. During the fabrication of rebar, if any abnormal phenomenon such as breaking, bad welding performance or distinct dynamics deficiency occurs, chemical component test or other special tests shall be performed.

¸Ö½îÓ¦Óгö³§ÖÊÁ¿Ö¤Ã÷ÊéºÍÊÔÑ鱨¸æµ¥£¬Ã¿À¦£¨ÅÌ£©¸Ö½î¾ùÓ¦ÓбêÅÆ¡£½ø³¡Ê±Ó¦°´Â¯¹Þ(Åú)ºÅ¼°Ö±¾¶·ÖÅúÑéÊÕ¡£ÑéÊÕÄÚÈÝ°üÀ¨¼ì²é±êÅÆ£¬Íâ¹Û¼ì²é£¬²¢°´Óйرê×¼µÄ¹æ¶¨³éÈ¡ÊÔÑù×öÁ¦Ñ§ÐÔÄÜÊÔÑ飬ºÏ¸ñºó·½¿ÉʹÓ᣸ֽîÔÚ¼Ó¹¤¹ý³ÌÖÐÈç·¢ÏÖ´à¶Ï¡¢º¸½ÓÐÔÄܲ»Á¼»òÁ¦Ñ§ÐÔÄÜÏÔÖø²»Õý³£ÏÖÏóʱ£¬Ó¦½øÐл¯Ñ§³É·Ö¼ìÑé»òÆäËüרÏî¼ìÑé¡£

a) Electric welding or gas cutting are forbidden to be used for rebar sampling.

Page 46 of 162 Rev.01

Execution Plan Ö´Ðмƻ® ½ØÈ¡¸Ö½îÊÔÑù£¬ÑϽû¶¯Óõ纸£¬Æøº¸Çи

b) The specification and brand of all the welding electrodes/wires must be in compliance with

the design requirement.

¹¤³ÌËùÓе纸ÌõµÄ¹æ¸ñ¡¢Åƺţ¬±ØÐë·ûºÏÉè¼ÆÒªÇó¡£

c) On site the delivered rebar must be kept by separately by the category, specification,

performance so as to prevent rusting and contamination.

¸Ö½î½ø³¡ºó£¬±ØÐë°´²»Í¬µÄÆ·ÖÖ¹æ¸ñ¡¢ÐÔÄÜ·Ö±ð¶Ñ·Å£¬·ÀÖ¹ÐâÊ´ºÍÎÛȾ¡£

d) All the stacked rebar, products and by products must be labeled with indication of the

description, specification, quantity and where it is to be used with the aim of preventing mishandling and contamination by greasy contents.

¶Ñ·ÅµÄ¸Ö½î¼°³ÉÆ·¡¢°ë³ÉÆ·¡¢±ØÐëÖðÒ»¹ÒÅÆ£¬±êÃ÷ÆäÃû¡¢¹æ¸ñ¡¢ÊýÁ¿¼°Ê¹Óò¿Î»£¬ÒÔÃâ·¢Éú²î´í£¬²¢·ÀÖ¹ÓÍÖ¬ÀàÎÛȾ¡£

1.6 Welding electrodes/wires shall be kept on the wooden (steel) shelf by the specification and

type so as to avoid moistening. The electrodes must be baking-treated before being used.

µçº¸ÌõÓ¦·Ö¹æ¸ñ¡¢ÅƺŷÅÖÃÔÚľ£¨Ìú£©ÖƵIJÄÁϼÜÉÏ£¬²»Ê¹Æä±ä³±£¬µçº¸ÌõÔÚʹÓÃÇ°±ØÐë°´¹æ¶¨½øÐкæÅã´¦Àí¡£ 2. Quality CriteriaÖÊÁ¿±ê×¼

2.1 The specification and quality of the rebars, the tag No. and properties of welding

electrodes and flux and the steel plate/profiles must be in compliance with the requirement of design and relevant codes.

¸Ö½îµÄÆ·ÖÖºÍÖÊÁ¿£¬º¸Ìõ¡¢º¸¼ÁµÄÅƺţ¬ÐÔÄܼ°½ÓÍ·ËùÓøְ壬Ð͸ֵȾù±ØÐë·ûºÏÉè¼ÆÒªÇóºÍÓйرê×¼µÄ¹æ¶¨¡£

2.2 The rebars¡¯ specification, shape, dimension, quantity, spacing distance, anchorage length

and joint must meet the requirement of the design and construction specification. The rebars¡¯ surface must be kept clean. The rebars with granular or scale rust can not be utilized according to the original specification if rust dots remain even after rust removal treatment.

¸Ö½îµÄ¹æ¸ñ¡¢ÐÎ×´¡¢³ß´çÊýÁ¿¡¢¼ä¾à¡¢Ãª¹Ì³¤¶ÈºÍ½ÓÍ·ÉèÖñØÐë·ûºÏÉè¼ÆÒªÇóºÍÊ©¹¤

¹æ·¶¶¨¡£¸Ö½îµÄ±íÃæ±ØÐëÇå½à¡£´øÓпÅÁ£»òƬ״ÀÏÐ⣬¾­³ýÐâºóÈÔÁôÓÐÂéµãµÄ¸Ö½î£¬ÑϽû°´Ô­¹æ¸ñʹÓá£

2.3 For tie-up of rebar mesh and framework, the quantity of missing binding and/or loose

binding shall be less than 20%, which should not be concentrated.

¸Ö½îÍøƬºÍ¹Ç¼ÜµÄ°óÔú£¬Æäȱ¿Û¡¢ËÉ¿ÛµÄÊýÁ¿²»µÃ³¬¹ýÓ¦°óÔúÊýÁ¿µÄ20%£¬ÇÒ²»µÃ¼¯

ÖС£

Page 47 of 162 Rev.01

Execution Plan Ö´Ðмƻ® 2.4 The quantity of omitted welding points and deficient welding points shall be less than 6%,

which should not be concentrated. For the slab inserted into the column, welding omission or deficiency is forbidden.

º¸½Ó¹Ç¼Ü²»µÃ©º¸¡¢¿ªº¸¡¢ÍøƬ©º¸¡¢¿ªº¸²»µÃ³¬¹ýº¸µãÊýµÄ6%£¬ÇÒ²»µÃ¼¯ÖС£°åÉìÈëÖ§×ù·¶Î§Äڵ帵ãÎÞ©º¸£¬¿ªº¸ÏÖÏó¡£ 3. Operation Preparation²Ù×÷×¼±¸

3.1 Prior to rebar machining, familiarity with the drawing and material allocation sheet as well

as the information for the specification, shape and dimension is necessary. If substitute is needed, the design party¡¯s consent shall be obtained beforehand.

¸Ö½î¼Ó¹¤Ç°Ó¦ÏÈÊìϤͼֽºÍÅäÁϵ¥£¬¸Ö½î¼Ó¹¤µÄ¹æ¸ñ¡¢ÐÎ×´¡¢³ß´ç¡£ÐèÒª´ú»»Ê±£¬ÒªÕ÷µÃÉè¼Æµ¥Î»µÄͬÒâ¡£

3.2 The rebar surface shall be clean without mars, and the greasy contamination or rusts must

be removed before being used.

¸Ö½î±íÃæÓ¦Çå½à£¬ÎÞËðÉË£¬ÓÍÖ¬ÎÛȾºÍÌúÐâµÈÓ¦ÔÚʹÓÃÇ°Çå³ý¸É¾»¡£

3.3 For each rebar machining course, a QA handover procedure shall be established. When

rebar tie-up is finalized and located in-place, verification inspection and concealing works acceptance procedure must be performed.

¸Ö½î¼Ó¹¤µÄ¸÷µÀ¹¤Ðò£¬¶¼Òª½¨Á¢ÖÊÁ¿½»½Ó¼ì²éÖƶȡ£¸Ö½î°óÔú°²×°Íê±Ïºó£¬±ØÐë¾­¹ý¼ìÑ飬²¢°ìÀíÒþ±Î¹¤³ÌÑéÊÕÇ©Ö¤ÊÖÐø¡£ 4. Steel Rebar Rust Removal¸Ö½î³ýÐâ

4.1 The rebar surface shall be clean. The oily dots, paint, and scales / rusts which can

be peeled with hammer shall be wiped out before the rebar is used. Prior to welding, rusts around welding joint shall be cleared off.

¸Ö½îµÄ±íÃæÒª½à¾»¡£ÓÍ×Õ¡¢ÆáÎÛºÍÓô¸ÇÃʱÄÜ°þÂäµÄ¸¡Æ¤¡¢ÌúÐâÔÚʹÓÃÇ°Çå³ý¸É¾»¡£ÔÚº¸½ÓÇ°£¬º¸µã´¦µÄ¸¡ÐâÇå³ý¸É¾»¡£

4.2 Try to remove the rusts by cold stretching and straightening the rebar as much as possible.

Electric de-rusting machine and manual rust removal can also be applied.

³ýÐ⹤×÷¾¡Á¿ÀûÓÃÀäÀ­ºÍµ÷Ö±¹¤Ðò½øÐгýÐâ¡£Ò²¿É²ÉÓõ綯³ýÐâ»úºÍÈ˹¤³ýÐâ¡£

5. Rebar Straightening¸Ö½îµ÷Ö± 6. Rebar Cut¸Ö½îÇжÏ

7. Rebar Bending Format¸Ö½îÍäÇú³ÉÐÍ

8. The quality of rebar bending shall meet the following requirement: ÍäÇú³ÉÐ͸ֽîµÄÖÊÁ¿Ó¦·ûºÏÏÂÁй涨£º

8.1The rebar is profiled in right shape, without warping or unevenness.